TRANSFER OF PROJECT SOLUTIONS TO RECLAMATION OF LAND DISTURBED AS A RESULT OF THE CONSTRUCTION OF THE WELL TO THE TERRAIN land management, working project, land reclamation, design solutions, technical scheme Viacheslav Frolov, Vladimir Kasyanov, Oleksandr Frolov, Darina Hryzodub https://doi.org/10.33744/0365-8171-2025-117.2-279-284 Read more